A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times

سال انتشار: 1387
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 398

فایل این مقاله در 6 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JOIE-2-3_005

تاریخ نمایه سازی: 22 آبان 1397

چکیده مقاله:

This paper presents a mathematical model for a flow shop scheduling problem consisting of m machine and n jobs with fuzzy processing times that can be estimated as independent stochastic or fuzzy numbers. In the traditional flow shop scheduling problem, the typical objective is to minimize the makespan). However,, two significant criteria for each schedule in stochastic models are: expectable makespan and the probability of minimizing the makespan. These criteria can be considered for fuzzy problems as well. In this paper, we propose a solution for the fuzzy model by the use of fuzzy logic based on developing the model presented by MacCahon

کلیدواژه ها:

نویسندگان

Jafar Razmi

Department of Industrial Engineering, College of Engineering, University of Tehran, Iran

Reza Tavakkoli Moghaddam

Department of Industrial Engineering, College of Engineering, University of Tehran, Iran

Mohammad Saffari

Department of Industrial Engineering, College of Engineering, University of Tehran, Iran