Using Markov Chain to Analyze Production Lines Systems with Layout Constraints

سال انتشار: 1387
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 473

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JOIE-2-3_002

تاریخ نمایه سازی: 22 آبان 1397

چکیده مقاله:

There are some problems with estimating the time required for the manufacturing process of products, especially when there is a variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines need a precise planning to reduce volume in particular situation of line stock. In this article, a hybrid model has been presented by analyzing real queue systems with layout constraints as well as by using concepts and principles of Markov chain in queue theory. This model can serve as benchmark to assess queue systems with probable parameters of service. Here, the proposed model will be described drawing on the findings of a case study. Thus, production lines of a home application manufacturer will be analyzed

کلیدواژه ها:

نویسندگان

Sadegh Abedi

Young research club Islamic Azad University, Qazvin Branch, Iran

Morteza Mousakhani

Department of management and accounting, Islamic Azad university of Qazvin, Qazvin, Iran

Naser Hamidi

Department of management and accounting, Islamic Azad university of Qazvin, Qazvin, Iran