Balancing and sequencing U-shaped mixed model assembly line problem considering setup times between tasks and demand ratio-base in dynamic environments

سال انتشار: 1395
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 625

فایل این مقاله در 9 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IIEC13_101

تاریخ نمایه سازی: 14 شهریور 1396

چکیده مقاله:

In mixed model assembly lines, several products with high similarity are simultaneously produced on an assembly line as per the sequence without any additional setup times between the models. This paper concentrates on mixed model assembly line balancing and sequencing type-II problem. The problem has some particular features such as U-shaped workstations and setup times between two consecutive tasks in dynamic periods wherein each period also affects the flowing period. This research intends to reduce cycle time and inventory costs. To this end, a non-dominated sorting genetic algorithm (NSGA-II) is used to solve the problem. Small scales of the problem are solved using both NSGA-II and GAMS software to evaluate the effectiveness of NSGA-II, and the obtained outcomes are compared. The computational results indicate that the NSGA-II is capable of providing high-quality solutions for small scales of the problem. Finally, conclusion and future research are provided.

نویسندگان

Masoud Rabbani

School of Industrial Engineering, College of Engineering, University of Tehran, P.O.Box: ۱۱۱۵۵-۴۵۶۳, Tehran, Iran

Reyhaneh Siadatian

School of Industrial Engineering, College of Engineering, University of Tehran, P.O.Box: ۱۱۱۵۵-۴۵۶۳, Tehran, Iran

Neda Manavizadeh

Department of Industrial Engineering, KHATAM University, Tehran, Iran