Return on Investment in Transmission Network Expansion Planning Considering Wind Generation Uncertainties Applying Non-dominated Sorting Genetic Algorithm
سال انتشار: 1397
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 120
فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
این مقاله در بخشهای موضوعی زیر دسته بندی شده است:
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JOAPE-6-1_009
تاریخ نمایه سازی: 13 آبان 1402
چکیده مقاله:
Although significant private investment is absorbed in different sectors of power systems, transmission sector is still suffering from appropriate private investment. This is because of the pricing policies of transmission services, tariffs, and especially for investment risks. Investment risks are due to the uncertain behaviour of power systems that discourage investors to invest in the transmission sectors. In uncertain environment of power systems, a proper method is needed to find investment attractive transmission lines with high investment return and low risk. Nowadays, wind power generation has a significant portion in total generation of most power systems. However, its uncontrollable and variable nature has turned it as a main source of uncertainty in power systems. Accordingly, the wind power generation can play a fundamental role in increasing investment risk in the transmission networks. In this paper, impact of this type of generation on investment risk and returned investment cost in transmission network is investigated. With different levels of wind power penetration, the recovered values of investment cost and risk cost in transmission network are calculated and compared. This is a simple method to find investment attractive lines in presence of uncertainties. Wherein, transmission network expansion planning (TNEP) is formulated as a multi-objective optimization problem with objectives of minimizing the investment cost, maximizing the recovered investment cost and network reliability. The point estimation method (PEM) is used to address wind speed variations at wind farms sites in the optimization problem, and the NSGA II algorithm is applied to determine the trade-off regions between the TNEP objective functions. The fuzzy satisfying method is used to decide about the final optimal plan. The proposed methodology is applied on the IEEE ۲۴-bus RTS and simplified Iran ۴۰۰ kV network.
کلیدواژه ها:
الگوریتم NSGA II ، روش برآورد نقطه ای ، سرمایه گذاری خصوصی ، برنامه ریزی توسعه شبکه انتقال ، تولید توان بادی
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :