Robustness price of open-pit mine production scheduling

سال انتشار: 1399
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 520

فایل این مقاله در 6 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_IJMGE-54-2_004

تاریخ نمایه سازی: 24 تیر 1399

چکیده مقاله:

An Open-Pit Production Scheduling (OPPS) problem focuses on specifying block production scheduling to achieve the highest possible Net Present Value (NPV). This paper presents a new mathematical model for OPPS under uncertainty. To this end, a robust box and ellipsoidal counterpart approach was used. The proposed method was implemented in a hypothetical model. A Genetic Algorithm (GA) and an exact mathematical modeling approach were used to solve the model. It was shown that the scheduling of deterministic and robust models in various conditions is different. Considering the type of robust counterparts, different production plans under various conditions were scheduled. Furthermore, the price of robustness was determined for various levels of conservation.

کلیدواژه ها:

Open-pit ، Production Scheduling ، robust counterpart and uncertainty

نویسندگان

Aref Alipour

Department of Mining Engineering, Urmia University of Technology, Urmia, Iran.

Ali Asghar Khodayari

School of Mining Engineering, College of Engineering, University of Tehran

Ahmad Jafari

School of Mining Engineering, College of Engineering, University of Tehran

Reza Tavakkoli-Moghaddam

School of Industrial Engineering & Engineering Optimization Research Group, College of Engineering, University of Tehran, Tehran, Iran.