A New Multi-objective Model for Multi-mode Project Planning with Risk
محل انتشار: ماهنامه بین المللی مهندسی، دوره: 31، شماره: 5
سال انتشار: 1397
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 621
فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJE-31-5_012
تاریخ نمایه سازی: 10 آذر 1398
چکیده مقاله:
The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this paper, linear relationships between time and cost, and between time and quality are omitted and the problem of the expected time-cost-quality tradeoff is considered in a probabilistic and discrete state. Then, to make the problem more real, the combination of four measures are considered as uncertain for each executive mode. It means that time, cost, quality or risk (or all of them) of each activity in each executive mode is considered as the expected numbers (probabilistic means). After modeling three objective problems, a test problem with nine activities is presented and solved by the NSGA-II algorithm. In order to improve the results and speed of the proposed algorithm in accessing Pareto solutions, a new hybrid algorithm, called MEM-NSGA, is presented that gives better solutions than the NSGA-II algorithm in the same conditions.
کلیدواژه ها:
Project scheduling ، Risk based project planning ، Discrete Time–Cost–Quality ، risk Trade ، Off ، Evolutionary Algorithm
نویسندگان
Reza Tavakkoli-Moghaddam
Industrial Engineering, University of Tehran
hamid reza mollaei
Industrial Management, Science and Research Branch, Islamic Azad University, Tehran
Abbas Toloie-Eshlaghy
Industrial Management, Islamic Azad University