Load Transfer and Factor of Safety of Lali Bridge Caisson Foundation
سال انتشار: 1389
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,802
فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICGESM04_364
تاریخ نمایه سازی: 18 خرداد 1389
چکیده مقاله:
The load transfer and factor of safety of Lali Bridge caisson foundations is discussed. The bridge is on Karoon River at elevation of 240 m after Gotvand Dam impoundment and the river level is at 110 meter now. This cable stay bridge has two piers each having two caissons foundations. The deck of the caissons is 16 by 32 meter and has a thickness of 5 meters. The caissons are of 10 meter diameter and have a depth of 20 meter in the rock. The submergence of the caissons after bridge operation necessitated a detailed study of load transfer and factor of safety and extreme care during construction to prevent disturbance of the surrounding rock interface.
کلیدواژه ها:
نویسندگان
Arsalan Ghahramani
Shiraz University, Department of Civil Engineering, Shiraz, Iran