Minimizing total weighted late work and cost of resources’ usage in the resource-constrained project scheduling problem
سال انتشار: 1396
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 317
فایل این مقاله در 5 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICIORS10_103
تاریخ نمایه سازی: 11 شهریور 1397
چکیده مقاله:
One of the problems related to resource-constrained project scheduling problem is weighted late work criterion because maybe activities do not have the same importance. In this paper this problem is considered and the objective is to minimize both the total weighted late work and resources cost. linear integer programming has been proposed for this problem. To prove these possible differences between activities an xample is calculated by GAMS and the result is shown
کلیدواژه ها:
نویسندگان
R Tavakoli-Moghadam
School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran
Z Tahaei
School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran
E Talebi
School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran