Minimizing total weighted late work and cost of resources’ usage in the resource-constrained project scheduling problem

عنوان مقاله: Minimizing total weighted late work and cost of resources’ usage in the resource-constrained project scheduling problem
شناسه ملی مقاله: ICIORS10_103
منتشر شده در دهمین کنفرانس بین المللی انجمن تحقیق در عملیات ایران در سال 1396
مشخصات نویسندگان مقاله:

R Tavakoli-Moghadam - School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran
Z Tahaei - School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran
E Talebi - School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran

خلاصه مقاله:
One of the problems related to resource-constrained project scheduling problem is weighted late work criterion because maybe activities do not have the same importance. In this paper this problem is considered and the objective is to minimize both the total weighted late work and resources cost. linear integer programming has been proposed for this problem. To prove these possible differences between activities an xample is calculated by GAMS and the result is shown

کلمات کلیدی:
Resource-constrained project scheduling, Late work