Critical success factors in construction or rehabilitation contracts regarding dams
سال انتشار: 1396
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 587
فایل این مقاله در 7 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
LTBD04_075
تاریخ نمایه سازی: 25 آذر 1396
چکیده مقاله:
Constructing or rehabilitating a dam, be it for hydro power generation or other purposes such as flood control, drinking water supply or irrigation, is a complex project. Drafting adapted contracts taking into account and balancing the mutual interests of the contractual parties (the - fiiture - owner as the Employer of the contract and the Contractor)l and aligning them with the requirements of other stakeholders of the project is a challenging task. The critical success factors are: • a clear-cut, unambiguous definition of the Scope of Works: this is the key provision of the contract and the benchmark, whether the works have been performed in compliance with the contract; • comprehensive rules regarding interface responsibilities and the interface management, be it between several Contractors, be it between the Employer and the Contractor; determination of the rely upon information to be provided by the Employer; • a carefully drafted provision regarding the allocation of typical risks in case of unforeseen events during the erection phase; • quality assurance: an accurate docrmrentation, the Employer’s approval-, inspection- and instruction rights and an adapted project organisation;• extensive reporting obligations to be complied with by the Contractor
نویسندگان
Bettina geisseler
GEISSELER LAW (Law firm), Germany