An Explainable-AI Decision-Support Framework for Managerial Early Warning in Construction Project Control
سال انتشار: 1405
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 21
فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IMPEB01_0505
تاریخ نمایه سازی: 10 آبان 1405
چکیده مقاله:
Construction project control requires timely interpretation of schedule, cost, progress, risk, change, procurement, and resource information. Earned Value Management (EVM) provides standardized diagnostic and forecasting functions, including trend analysis and estimates at completion, but conventional EVM has limited ability to integrate heterogeneous contextual drivers, nonlinear interactions, and explainable multivariate risk. This conceptual paper proposes an explainable-AI decision-support framework for managerial early warning in construction project control. The method is explicitly a targeted narrative literature synthesis and framework-development exercise rather than a PRISMA systematic review or an empirical model-validation study. The framework's novelty is positioned in an end-to-end governance chain that connects status-date project data to a specified two-period breach-prediction task, calibrated probability and uncertainty, local model explanation, governance-oriented probability-impact prioritization, an approved project-control action playbook, human approval, and intervention-aware feedback. The primary use case is binary classification at each project reporting period: estimating the probability that a project will cross an organization-defined red schedule-control threshold within the next two reporting periods. A transparent ۱۲-period EVM scenario is used only to illustrate control logic, thresholding, data alignment, and managerial communication; it is not field data and no trained-model, SHAP, or validation statistics are fabricated. The framework further requires project-wise and time-wise out-of-sample validation, comparison with non-AI EVM warning rules, managerial early-warning metrics such as lead time and false alarms per project, and explicit separation between predictive attribution and causal evidence. AI is therefore positioned as a governed decision-support component that augments, rather than replaces, project-manager accountability.
کلیدواژه ها:
نویسندگان
Seyyed Azim Hosseini
Department of Civil Engineering, ST.C., Islamic Azad University, Tehran, Iran
Mohammad Mahdi Chegini
PhD Student, Construction Engineering and Management, Department of Civil Engineering, Islamic Azad University, South Tehran Branch, Tehran, Iran