Promoting the Optimal Maintenance Schedule of Generating Units in a Competitive Environment Based on Genetic Algorithm

سال انتشار: 1384
نوع سند: مقاله کنفرانسی
زبان: فارسی
مشاهده: 1,422

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

این مقاله در بخشهای موضوعی زیر دسته بندی شده است:

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

PSC20_177

تاریخ نمایه سازی: 8 آذر 1385

چکیده مقاله:

This paper presents a Genetic Algorithm methodology for finding the optimum preventive maintenance schedule of generating units of GENCOs in a restructured power system. In this environment, management of GENCOs and grid is separated, each maximizing its own benefit. Therefore, the principle to draw up the unit maintenance scheduling will be changed significantly. The profit of GENCO is defined as the total profit, which is the sum of the individual units’ profits from the auctions over the horizon. So each GENCO hopes to schedule its maintenance on the weeks when the spot marginal price (SMP) is lower, so that maintenance investment loss (MIL) is minimized. Therefore, objective function for the GENCO is to sell electricity as much as possible, according to the market clearing price forecast. Various technical constraints such as generation capacity, duration of maintenances and maintenance continuity are being taken in to account. The objective function of ISO is to maximize the reliability throughout the weeks of year. Various constraints such as minimum net reserve, duration of maintenance are being taken in to account. Therefore there are two objective functions for finding an optimum maintenance schedule in restructured power systems. Each GENCO specifies optimum maintenance schedule according to its objective function and hands it over to ISO. The ISO compares its own reliability index with reliability index related to maintenance schedule of GENCOs. If they are close enough in terms of reliability, it will be approved; otherwise the ISO sets up incentives and disincentives for each period to encourage GENCOs to modify their maintenance schedule so that the difference between reliability indices obtained by objective function of ISO and the GENCOs is minimized.

نویسندگان

Eshraghnia

Master of Engineering Department of Electrical Engineering Ferdowsi University of Mashhad Iran

Modir Shanehchi

Associate Professor Department of Electrical Engineering Ferdowsi University of Mashhad Iran

Rajabi Mashhadi

Assistant Professor Department of Electrical Engineering Ferdowsi University of Mashhad Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • M. Shahidehpour and M.Marwali ، #Maintenance Scheduling in Restructured Power ...
  • M. Shahidehpour S.M Alomoush M. ، Restructued Eectrical Power System ...
  • R.Billinton and A .Abdulwhab, "Short-term Generating unit Maintenance Scheduling in ...
  • W.Peng and Ma Rui and He Renmu, "Research _ Multi- ...
  • A.J. Conejo & R.G. Bertrand & M.D. Salazar, " Generation ...
  • ، Maintenance Scheduling in Power Systems Using Genetic Algorithm', IEEE, ...
  • Jin-Ho Kim, j. Bae Park, J.Keun Park, " _ New ...
  • http : //www .nordpool .com ...
  • N .Mohammadi Tabari *Promoting the Optimal Maintenance Schedule of Generating ...
  • نمایش کامل مراجع