Identification and prioritization of time and financial risks in railway projects ("case study: ۱-Miyaneh- Bostanabad,۲-Shiraz urban train stations")
محل انتشار: ششمین کنفرانس بین المللی پژوهش در علوم و مهندسی و سومین کنگره بین المللی عمران، معماری و شهرسازی آسیا
سال انتشار: 1400
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 396
فایل این مقاله در 11 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICRSIE06_364
تاریخ نمایه سازی: 8 اسفند 1400
چکیده مقاله:
One of the essential things in managing rail construction projects is project time management. Today, comprehensive and accurate project time management, including resource planning, scheduling, and time control, has become not only one of the strategic issues in projects but also the main concerns of stakeholders. Reduction in projectexecution time is one of the most critical challenges of construction management. In our country, the problem that affects most of the railway construction projects is not starting, implementing, and exploiting them on time and according to the scheduling. In this paper, first, the causes of delays in railway construction projects and their prioritization will be identified and then with a case study of two railway projects, "Completion of the infrastructure of section ۸b and ۹ of the middle railway - Bostanabad-Tabriz" and "Design Shiraz city train stations " the causes of delays in them, including the type of contract system, price increase due to inflation, lack of proper buoyancy time, etc., will be reviewed and predicted throughout the project. In the end, solutions such as: concluding foreign exchange contracts, implementing projects after attracting the approved budget, considering late penalties, etc., to prevent such problems will be offered.
کلیدواژه ها:
نویسندگان
Yekta Nateghi
Master Student in Railway Tracks Engineering, Iran University of Science and Technology. School of Railway Engineering. Tehran. Iran
Mohammad Tavakol
Master of Science in Railway Tracks Engineering, Iran University of Science and Technology. School of Railway Engineering. Tehran. Iran
Mohammad Amiri
Assistant Professor, University of Hormozgan, Faculty of Engineering, Bandar Abbas, Iran.,