engineering geological evaluation of reservoir leakage problem

سال انتشار: 1384
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 997

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

SUADE01_063

تاریخ نمایه سازی: 15 آبان 1390

چکیده مقاله:

The 260 mill m3 capacity Samanalawewa reservoir, formed by a 100m high embankment dam is the key element of the 120 MW Samanalawewa Hydroelectric Project, constructed on the Walawe, one of the main rivers in Sri Lanka. The reservoir developed a water leakage in its right bank right along with the impounding due to the adverse geological conditions existed. Geologically the project is lying in an area within the Highland series of the Sri Lankan Precambrian complex comprising crystalline metamorphic rocks. Further the area has been subjected to extensive folding, faulting and hydrothermal reactions converting the project area in to a geologically complex nature. The site has been studied by number of agencies in several occasions involving detailed geological, hydrogeological geophysical etc. investigations. However amidst the detailed investigations conducted the signs of a possible leakage through the right bank were surfaced during dam construction stage itself with the poor geological conditions encountered in the right abutment excavation. Immediate additional investigations coupled with improvements to the cut off works had to be implemented. In the initial trial impounding at the end of construction with partially filled reservoir the leakage was appeared and the impounding suspended for remedial measures. A 100m deep 1800m long grout curtain was constructed as the remedial measure and the impounding recommenced. The leakage continued to increase amidst the massive grout curtain placed behind and finally resulted in a severe earth slip. Again the impounding had to be suspended and the detailed investigations and remedial measures were called for. As the second attempt of sealing the leakage, laying of a clay blanket over the suspected ingress zones was planned. However even after the construction of the blanket the reservoir leakage could not be arrested though it helped to reduce the right bank ground water pressures. At present the reservoir is operated with a continuous leakage of 1800 litres per second amidst the various investigations and remedial measures implemented.As discussed in detail the failure in remedying the leakage problem is due to the inability in establishing exact leakage mechanism owing to the complex geological conditions prevailing at site.

نویسندگان

K. LAKSIRI

Doctoral student, Department of Engineering Systems & Technology, Saga University, Saga, Japan

J. GUNATHILAKE

Senior Lecturer, Department of Geology, University of Peradeniya, Kandy, Sri Lanka

Y. IWAO

Professor, Department of Engineering Systems & Technology, Saga University, Saga, Japan

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Ceylon Electricity Board (1993), Re commendation for Remedial Measures to ...
  • Ceylon Electricity Board (1992), Third Party Review Report No.1, SMW-1 ...
  • Ceylon Electricity Board (1993), Third Party Review Report No.2, SMW-2, ...
  • Engineering Consultants Incorporated (1966), Samanalawewd Project Technical Report, USA (unpublished) ...
  • Electrowatt Engineering services Ltd. (1984), Samanalawewd Hydroelectric Scheme Review Report ...
  • JVS Consultants (1987), Report on Additionat Geotechnical Investigations for Samana ...
  • نمایش کامل مراجع