Multi-Period Railway Network Design Model; Arc-based vs. Path-based Modeling

سال انتشار: 1398
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 535

نسخه کامل این مقاله ارائه نشده است و در دسترس نمی باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

ICRARE06_024

تاریخ نمایه سازی: 6 بهمن 1398

چکیده مقاله:

Railway networks are one of the major parts of transportation infrastructure of the countries. Development of this network needs time and capital cost. Having an optimizedplan for yearly investment on improvement of the network is a necessary thing. In this paper, to access a plan to implement development projects in the network and allocate the required budget for a specified period, a multi-period railway network design problem is modeled based on two approach, arc-based and path-based modeling. These models consider development projects (new lines construction and existing lines improvement), available budget in each period, origin -destination demand matrix for each period, block capacity and technical capacity. To show efficiency of the models and comparing these modeling approaches, the Iranian Railway Network is used in different scenarios of demand. The selected projects by the presented models and their usage percentage show the ability and efficiency of the model.

کلیدواژه ها:

نویسندگان

S. Alireza Seyedvakili

PhD candidate, School of Railway Engineering, IUST, Tehran, Iran,

Jabbar-Ali Zakeri

Professor, Centre of Excellence in Railway Transport, School of Railway Engineering, IUST, Tehran,Iran,

S.Masoud Nasr Azadani

Assistant Professor, School of Railway Engineering, IUST, Tehran, Iran,

Yousef Shafahi

Professor, Department of Civil Engineering, Sharif University, Tehran, Iran,

Mohammad Karimi

MSc of Railway Engineering, School of Railway Engineering, IUST, Tehran, Iran,