Optimal production strategy of bimetallic deposits under technical and economic uncertainties using stochastic chance-constrained programming

سال انتشار: 1396
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 286

فایل این مقاله در 11 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JMAE-8-3_012

تاریخ نمایه سازی: 18 تیر 1398

چکیده مقاله:

In order to catch up with reality, all the macro-decisions related to long-term mining production planning must be made simultaneously and under uncertain conditions of determinant parameters. By taking advantage of the chance-constrained programming, this paper presents a stochastic model to create an optimal strategy for producing bimetallic deposit open-pit mines under certain and uncertain conditions. The uncertainties of grade, price per product, and capacities of the various stages in the process of production of the final product were considered. The results of solving the deterministic and stochastic models showed that the stochastic model had a greater compatibility and performance than the other ones.

کلیدواژه ها:

نویسندگان

E. Bakhtavar

Department of Mining and Materials Engineering, Urmia University of Technology, Urmia, Iran

A. Jafarpour

Department of Mining and Materials Engineering, Urmia University of Technology, Urmia, Iran

S. Yousefi

Department of Industrial Engineering, Urmia University of Technology, Urmia, Iran