Developing an MILP model to minimize makespan in distributed no-wait flow shop with transportation time
سال انتشار: 1396
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 621
فایل این مقاله در 7 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICIORS10_084
تاریخ نمایه سازی: 11 شهریور 1397
چکیده مقاله:
Recent globalization trend causes the emergence of intense competition for the best interest between the manufacturers. To maintain competitiveness in these markets, companies decide to establish a production network consisting of several factories. The Members scattered in different geographical locations in distributed structures cause the availability of cheaper resources, higher production capability and faster facing to changes and higher competitive ability. For this purpose, in this research, a distributed multi-factory scheduling is studied on no-wait flowshop environment. Furthermore, to consider the possibility of moving jobs between factories, a transportation network is compromised in the structure of the research problem. This research aims to develop a new mathematical model for distributed no-wait flow shop scheduling problem with transportation time with make span minimization. The proposed mathematical model is coded in LINGO9 and is solved by Cplex solver.
کلیدواژه ها:
نویسندگان
Homa Mahmoudi
Masters student of Industrial engineering, Department of Industrial engineering, Babol Noshirvani University of Technology
Ebrahim Asadi Gangraj
Assistant Professor of Industrial engineering, Department of Industrial engineering, Babol Noshirvani University of Technology
Saeed Emami
Assistant Professor of Industrial engineering, Department of Industrial engineering, Babol Noshirvani University of Technology