Reliability-based maintenance scheduling for loading machines in open pit mines-Case study: Sarcheshmeh copper mine

سال انتشار: 1395
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 402

متن کامل این مقاله منتشر نشده است و فقط به صورت چکیده یا چکیده مبسوط در پایگاه موجود می باشد.
توضیح: معمولا کلیه مقالاتی که کمتر از ۵ صفحه باشند در پایگاه سیویلیکا اصل مقاله (فول تکست) محسوب نمی شوند و فقط کاربران عضو بدون کسر اعتبار می توانند فایل آنها را دریافت نمایند.

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

RELI04_083

تاریخ نمایه سازی: 1 مرداد 1397

چکیده مقاله:

Open pit mines have very high economical and operational risk because of high rate of production and using large scale machines. Therefore, it is necessary to assurance the availability of the operational equipment. Nowadays, operation conditions and machines availability can be assessed and analyzed with use of the reliability methods and consequently by carrying out the preventive maintenance scheduling in order to decrease downtimes and costs. This paper aims to model and analyze the reliability of loading machines (shovel) in Sarcheshmeh Copper Mine and to present preventive maintenance scheduling based on the result of reliability modelling. For this purpose, each shovel was considered a subsystem of loading fleet. At first, the failure data have been collected and analyzed. Result showed that two machines 2206 and 2209 are critical machines with regard to the time of failure and number of failure respectivily. Then by using probability method and conducting serial correlation and trend test, best fit distribution and the reliability model for each machine has been determined. In the next step, the reliability of loading fleet has been determined by considering the parallel configuration of subsystems. The results showed the reliability of loading fleet reached to 50% after 100 hours of operation. In addition, it reduces to 20%, approximately 200 hours. Finally preventive reliability-based maintenance for machines at 80% reliability has been suggested 7, 14 and 21 hour time intervals. With the use of this preventive maintenance, the reliability of loading fleet has always remained at the level of greater than 99%.

نویسندگان

Seyed Javad Hosseini Kiasari

Faculty of mining, petroleum and geophysics, Shahrood University of technology, Iran

Sadjad Mohammadi Ivatloo

Faculty of mining, petroleum and geophysics, Shahrood University of technology, Iran

Reza Kakaei

Faculty of mining, petroleum and geophysics, Shahrood University of technology, Iran

Mohammad Ataei

Faculty of mining, petroleum and geophysics, Shahrood University of technology, Iran