Environmental risk assessment of a dam during construction phase

سال انتشار: 1395
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 550

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_GJESM-2-4_006

تاریخ نمایه سازی: 9 خرداد 1396

چکیده مقاله:

The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated by MIKE-11 model. In order to check whether or not the dam construction could affect the quality of the Gavi River, the physicochemical quality of the river water was also tested. Afterwards, a questionnaire was prepared containing an inventory of possible risks supposed to be induced by construction of Gavi Dam. The questionnaires were placed at disposal of experts to score the items based on their importance. The questionnaires were then analyzed using SPSS Software, version 16. According to which, a total number of 12 risk factors were identified. The dam construction risks were qualitatively assessed by preliminary hazard analysis. Based on the results, 3 of 12 identified risks were recognized unacceptable. The shortlisted risks were prioritized at final step using technique for order of preference by similarity to ideal solution. Habitat fragmentation with a weight of 0.3002, water pollution with a weight of 0.295, and impacts on aquatics with a weight of 0.293 were identified as three top priority flooding risks. Among the most important corrective measures for mitigation of the risks at construction phase can be pointed to restoration of the land cover , conservation of areas surrounding the dam as a new wildlife habitat , prevention of water contamination , and conservation of fish spawning sites .

کلیدواژه ها:

Construction phase ، Gavi Dam ، MIKE-11 ، Preliminary hazard analysis (PHA) ، Risk ، Technique for order of preference by similarity to ideal solution (TOPSIS)

نویسندگان

S Rezaian

Department of the Environment, Islamic Azad University, Shahrood Branch, Shahrood, Iran

S.A. Jozi

Department of the Environment, Islamic Azad University, North Tehran Branch, Tehran, Iran

N. Zaredar

Department of Environmental Sciences, Graduate School of the Environment and Energy, Science and Research Branch, Islamic Azad University, Tehran, Iran