Risk Management in Design, Construction and Operation of Tunnel Projects (with 3 case studies)

سال انتشار: 1384
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 2,915

فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IPMC02_037

تاریخ نمایه سازی: 13 دی 1384

چکیده مقاله:

Traditionally, risks have been managed indirectly through the engineering decisions taken during the project development. In this paper we consider the present risk management processes that can be significantly improved by using systematic risk management techniques throughout the tunnel project development. By the use of these techniques potential problems can be clearly identified such that appropriate risk mitigation measures can be implemented in a timely manner.

نویسندگان

Morteza Gharouni Nik

Associated Professor, Department of Railway engineering, Iran University of Science and Technology

Meisam Jafari

M.Sc Student of Industrial Engineering, department of industrial engineering, Iran University of Science and Technology

Amin Askarinejad

M.Sc Student of Geotechnics, department of civil engineering, Iran University of Science and Technology