CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Risk Management in Design, Construction and Operation of Tunnel Projects (with 3 case studies)

عنوان مقاله: Risk Management in Design, Construction and Operation of Tunnel Projects (with 3 case studies)
شناسه ملی مقاله: IPMC02_037
منتشر شده در دومین کنفرانس بین المللی مدیریت پروژه در سال 1384
مشخصات نویسندگان مقاله:

Morteza Gharouni Nik - Associated Professor, Department of Railway engineering, Iran University of Science and Technology
Meisam Jafari - M.Sc Student of Industrial Engineering, department of industrial engineering, Iran University of Science and Technology
Amin Askarinejad - M.Sc Student of Geotechnics, department of civil engineering, Iran University of Science and Technology

خلاصه مقاله:
Traditionally, risks have been managed indirectly through the engineering decisions taken during the project development. In this paper we consider the present risk management processes that can be significantly improved by using systematic risk management techniques throughout the tunnel project development. By the use of these techniques potential problems can be clearly identified such that appropriate risk mitigation measures can be implemented in a timely manner.

کلمات کلیدی:
Risk management, Tunnels, underground excavations, contract, construction, operation

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/4815/