Incorporating uncertainty in Project Planning

سال انتشار: 1384
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,689

فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IPMC02_036

تاریخ نمایه سازی: 13 دی 1384

چکیده مقاله:

Project planning inevitably involves uncertainty. The basic input parameters for planning (time, cost and resources for each activity) are not deterministic and are affected by various sources of uncertainty. Moreover, there is a causal relationship between these uncertainty sources and project parameters; this causality is not modeled in current state-of-the-art project planning techniques (such as simulation techniques). In this paper we present an approach, using Bayesian network modelling, that addresses both uncertainty and causality in project management. Bayesian networks have been widely used in a range of decision-support applications, but the application to project management is novel. The model we present empowers the traditional Critical Path Method (CPM) to handle uncertainty and also provides explanatory analysis to elicit, represent, and manage different sources of uncertainty in project planning.

نویسندگان

Vahid Khodakarami

PhD student in Radar group Department of Computer Science Queen Mary University of London

Norman Fenton

Professor of computer Science and head of Radar group Department of Computer Science Queen Mary University of London