State-of-the-Art Review on Risk Modeling and Assessment in Construction Projects – from 1983 to 2015

سال انتشار: 1394
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 593

فایل این مقاله در 14 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

ERMCONF01_015

تاریخ نمایه سازی: 30 بهمن 1394

چکیده مقاله:

The main tools for decision making in project management is the information that isprovided by project planning teams. The information such as activities time, cost and thelevel of resource, organizes the project progress reports. Duration and cost of each projectactivity could change dynamically as a result of many uncertain variables, such as resourceavailability and weather. Therefore, project managers have to take these uncertainties in toaccount so as to provide an optimal balance of time and cost, based on their own knowledgeand experience. The uncertainties that must be managed in each project are categorized in two maingroups; First group covers non-probable uncertainties that are related to project nature and itscomplexity that managed by possibility based Methods and the second group includes probableuncertainties which are managed by risk management. No construction project is risk free. Risk canbe managed, minimized, shared, transferred or accepted. Several risk identification and assessmentmethods have been proposed in the literature to facilitate project risk management. Although riskassessment is probably the most difficult component of the risk management process, it is potentiallythe most useful and it has been claimed by many researchers that a risk driven approach to projectmanagement is necessary the success of construction projects. This paper aims to comprehensivelyreview the Risk Modeling and Assessment in Construction Projects literature that has been publishedin top quality journals from 1983 up to 2015.

کلیدواژه ها:

Risk Management ، Risk Modeling and Assessment ، possibility ، uncertainty

نویسندگان

Abbas Naderpour

Ph.D. Student, Faculty of Engineering, Islamic Azad University, Central Tehran Branch, Iran.

M Mofid

Professor, Department of Civil Engineering, Sharif University of Technology, Iran

J Majrouhi Sardroud

Assistant Professor, Faculty of Engineering, Islamic Azad University, Central Tehran Branch, Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Akinci, B and M Fischer. "Factors Affecting Contractors Risk of ...
  • Ashley, D.B and J.J Boner. "Political Risks in International Construction: ...
  • Car, V and J Tah. "A Fuzzy Approach to Construction ...
  • Chapman, c and D Cooper. "Risk Engineering : Basic Controlled ...
  • Chapman, R.J. "The Controlling Influences of Effective Risk Identification and ...
  • Choi, H.H, H.N Cho and J.W Seo. "Risk Assessment Methodology ...
  • Dey, K.P. "Decision Support System for Risk Management : A ...
  • Diekmann, J.E. "Risk Analysis : Lessons from Artificial Intelligence." International ...
  • Dikmen, l, M.T Birgonal and S Han. "Using Fuzzy Risk ...
  • Eybpoosh, M, I Dikmen and M.T Birgonal. "Identification of Risk ...
  • Franke, A. "Risk Analysis in Project Management." Interndtional Journal of ...
  • Hastak, M and A Shaked "Icram-1 : Model for International ...
  • Hayes, R.W, J.G Perry, P.A Thompson and G Willmer. Risk ...
  • Hertz, D.B and H Thomas. Risk Analysis and Its Applicotion. ...
  • Hull, J.K. "Application of Risk Analysis Techniques i Proposal Assessment. ...
  • Jun, _ M Qiuzhen and M Qingguo. "The Effect of ...
  • Kangari, R and L.S Riggs. "Construction Risk Assessment by Linguistics." ...
  • Kim, D.Y, S.H Han, H Kim and H Park. "Structuring ...
  • Molenaar, K.R. "Programatic Cost Risk Analysis for Highway Mega Projects." ...
  • Mulholland, B and J Ch.ristian. "Risk Assessment in Construction Schedules." ...
  • Mustafa, M.A and J.F AI-Bahar. "Project Risk Assessment Using the ...
  • Oztas, A and o Okmen. "Risk Analysis in Fixed-Price Design-Build ...
  • Paek, J.H, Y.W Lee and J.H Ock. "Pricing Construction Risks ...
  • Renuka, S.M, C Umarani and S Kamal. "A Review on ...
  • Riggs, J.L, S.B Brown and R.B Trueblood "Integration of Technical, ...
  • Tah, J.H and V Carr. _ Kn owledge-Base Approach to ...
  • Taroun, A, J Yang and D Lowe. "Construction Risk Modelling ...
  • Tavares, L.V, J.A Ferreria and S Coelh, "On the Optimal ...
  • Thomas, A.V, S.N Kalidindi and L.S Ganesh. "Modeling and Assessment ...
  • Ward, S.C. "Assessing and Managing Important Risks." Internotionol Journal of ...
  • Williams, T. "The Two-Di mensiona lity of Project Risk." International ...
  • Wirba, E.N, J.H.M Tah and R Howes. "Risk I nterd ...
  • yildiz, A, I Dikmen, M Birgonul, K Ercoskun and A ...
  • نمایش کامل مراجع