Reliability-Oriented Optimal Placement of Thyristor-Controlled Phase-Shifting Transformers under Operational Uncertainty
سال انتشار: 1405
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 25
فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_ECE-3-2_004
تاریخ نمایه سازی: 22 مهر 1405
چکیده مقاله:
The Thyristor-controlled phase-shifting transformer (TCPST), a member of the flexible AC transmission systems (FACTS) family, offers an effective solution for mitigating transmission congestion while enhancing power system security and reliability. This paper introduces an innovative framework for determining the optimal location of TCPST to improve power system reliability under uncertainty. The proposed method accounts for power system uncertainties, including the availability of generation units and network components, modeled using forced outage rates (FORs) through scenario generation based on Monte Carlo simulation (MCS). To address the non-convex nature of the resulting mixed-integer non-linear programming problem, a linear approximation of power flow equations is employed, transforming the problem into a mixed-integer linear programming (MILP) formulation. The objective is to minimize load curtailment by identifying the optimal TCPST locations across different scenarios. The results are then ranked based on their contribution to reliability improvement, using the Probability of Load Curtailment (PLC) index. Extensive numerical studies on a modified reliability test system (RTS) demonstrate the efficacy of the proposed approach. Results show a ۱۷.۱۴% reduction in the annual Expected Energy Not Supplied (EENS) (from ۶۴۶,۶۴۰ MWh/year to ۵۳۵,۸۰۵ MWh/year) and a ۲۵.۲۹% improvement in the PLC index (from ۰.۳۴۴ to ۰.۲۵۷). These findings validate the effectiveness of the proposed stochastic optimization framework in enhancing power system reliability under uncertain conditions.
کلیدواژه ها:
Reliability ، Uncertainty ، Phase shifting transformer ، Interrupted Energy Assessment Rate ، Expected Energy Not Supplied
نویسندگان
- -
۱. East Azerbaijan Electric Power Distribution Company, Iran
- -
Faculty of Electrical and Computer Engineering, University of Tabriz, Tabriz, Iran
- -
Faculty of Electrical and Computer Engineering, University of Tabriz, Tabriz
- -
Faculty of Electrical and Computer Engineering, University of Tabriz, Tabriz
- -
Faculty of Electrical and Computer Engineering, University of Tabriz, Tabriz
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :