Different Strategies of Interruptible Load Contracts Implemented in Reliability Constrained Unit Commitment

سال انتشار: 1392
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 974

فایل این مقاله در 6 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

ICEE21_822

تاریخ نمایه سازی: 27 مرداد 1392

چکیده مقاله:

In restructured power markets, participants try to optimize their profit/cost. In this market driven environment, by increasing fuel cost, ISO tries to make new opportunities andfacilities to minimize power prices and consequently increase social welfare. One of these opportunities is interruptible loadthat traditionally used to reduce overloads and maintain network security. In restructured power exchange, an interruptible load contract may contain many details andlimitations. In this paper, ISO offers flexible contract in which load limitation are considered. Therefore contract is compatiblewith load situations. Hence, three different interruptible loads with different limits and different prices were considered in unit commitment program for day-ahead market. In order to maintain security, probabilistic reliability constraints are used. Finally, the effect of different interruptible loads and reliability constraints on operational cost are analyzed

کلیدواژه ها:

Unit commitment (UC) ، reliability constrained unit commitment ، spinning reserve (SR) ، Interruptible load (IL) contract ، Benders decomposition

نویسندگان

V Davatgaran