Operation Planning of Wind Farms with Pumped Storage Plants Based on Interval Type-۲ Fuzzy Modeling of Uncertainties

سال انتشار: 1399
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 179

فایل این مقاله در 13 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JOAPE-8-3_001

تاریخ نمایه سازی: 13 آبان 1402

چکیده مقاله:

The operation planning problem encounters several uncertainties in terms of the power system’s parameters such as load, operating reserve and wind power generation. The modeling of those uncertainties is an important issue in power system operation. The system operators can implement different approaches to manage these uncertainties such as stochastic and fuzzy methods. In this paper, new fuzzy based modeling approach is implemented to develop the new formulation of power system problems under an uncertain environment with energy storage systems. Interval type-۲ fuzzy membership function (MF) is implemented to model the uncertainty of available wind power generation and the type-۱ fuzzy MF is used to model the other parameters in weekly unit commitment (UC) problem. The proposed approach is applied to two different test systems which have conventional generating units, wind farms and pumped storage plants to consider differences between the type-۱ and type-۲ fuzzy approaches for uncertainty modeling. The results show that the total profit of UC problem using type-۲ fuzzy MF is better than type-۱ fuzzy MF.

نویسندگان

H. Siahkali

Engineering Faculty, Islamic Azad University-South Tehran Branch, Ahang Ave., Tehran, Iran.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • C. L. Chen, “Optimal wind–thermal generating unit commitment”, IEEE Trans. ...
  • J. Garcia-Gonzalez, R. de laMuela, L. Santos and A. Gonzalez, ...
  • S. Saneifard, N. Prasad and H. Smolleck, “A fuzzy logic ...
  • H. Y. Yamin, “Fuzzy self-scheduling for Gencos,” IEEE Trans. Power ...
  • H. Siahkali and M. Vakilian, “Integrating large scale wind farms ...
  • L. A. Zadeh, “The concept of a linguistic variable and ...
  • Q. Liang and J. Mendel, “Interval type-۲ fuzzy logic systems: ...
  • M. Wagenknecht and K. Hartmann, “Application of fuzzy sets of ...
  • N. N. Karnik and J. M. Mendel, “Operations on type-۲ ...
  • N. N. Karnik and J. M. Mendel, “Type-۲ fuzzy logic ...
  • J. M. Mendel and R. I. John, “Type-۲ fuzzy sets ...
  • M. Mizumoto and K. Tanaka, “Fuzzy sets of type-۲ under ...
  • O. Castillo and P. Melin, “Type-۲ fuzzy logic: theory and ...
  • J. M Mendel, “Uncertain rule-based fuzzy logic systems: introduction and ...
  • M. Majidi, S. nojavan and K. Zare, “Optimal sizing of ...
  • E. Heydarian-Forushani and H. A. Aalami, “Multi objective scheduling of ...
  • A. Tuohy and M. O’Malley, “Pumped storage in systems with ...
  • B. C. Ummels, E. Pelgrum and W. L. Kling, “Integration ...
  • B. Ummels, M. Gibescu, E. Pelgrum, W. Kling and A. ...
  • M. Black, V. Silva and G. Strbac, “The role of ...
  • P. Denholm and M. Hand, “Grid flexibility and storage required ...
  • G. Qin, G. Liu, Z. Jing and Y. Zhang, “A ...
  • M. E. Nazari and M. M. Ardehali, “Optimal scheduling of ...
  • M. Vatanpour and A. S. Yazdankhah, “The impact of energy ...
  • A. Tuohy and M. O’Malley, “Impact of pumped storage on ...
  • N. Shi, S. Zhu, X. Su, R. Yang and X. ...
  • P. Brown, J. Lopes and M. Matos, “Optimization of pumped ...
  • B. Bagen, “Reliability and cost/worth evaluation of generating systems utilizing ...
  • N. Lu, J. Chow and A. Desrochers, “Pumped-storage hydro-turbine bidding ...
  • S. Coupland and R. John, “Geometric type-۱ and type-۲ fuzzy ...
  • GAMS Release ۲.۵۰, “A user’s guide”, GAMS, Development Corporation, ۱۹۹۹ ...
  • IEEE Reliability Test System Task Force, “The IEEE reliability test ...
  • S. Wang, S. shahidehpour, D. Kirschen, S. Mokhtari and G. ...
  • H. Siahkali and M. Vakilian, “Electricity generation scheduling with large-scale ...
  • نمایش کامل مراجع