Integrating Production Scheduling with Mid-Term Planning Decisions Using a Decomposition Based Solution Approach

سال انتشار: 1390
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,434

فایل این مقاله در 9 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

NCLSC04_073

تاریخ نمایه سازی: 24 مهر 1391

چکیده مقاله:

In this paper, an operational scheduling problem integrated with a tactical planning decision is considered. We propose resource-dependent processing times (RDPT) for permutation flow shop scheduling problems (FSSP) in which the processing time of a job depends on the amount of several types of additional resources should be assigned to that job in planning stage. To make a trade-off between makespan and required amount of resources, a linear combination of two criteria is considered: the maximum completion time and the total cost of resources. This problem has not been treated in literature yet. Furthermore, a decomposition approach is suggested that strives to tackle the main problem via two subproblems: sequencing problem and resource allocation problem. A discrete differential evolution (DDE) algorithm and a variable neighborhood search (VNS) are combined to solve two subproblems effectively.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • nd _ nternational and 4th National LOGISTCS AND SUPPLY CHAlN ...
  • www.i Iscs-conf. ir i nfo@ ilscs-conf.ir 22 - 23 Nov. ...
  • _ Research, vol. 2? 1995, pp. ...
  • نمایش کامل مراجع