Two-Machine Open Shop Scheduling with Proportionally Deteriorating Jobs and Makespan Objective
سال انتشار: 1401
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 181
فایل این مقاله در 9 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JOIE-15-2_025
تاریخ نمایه سازی: 9 مهر 1401
چکیده مقاله:
This manuscript examines the two-machine open shop scheduling problem where the latter a job is scheduled the longer it takes to process this job. The performance is measured by minimizing the makespan. By modifying existing algorithms for the corresponding problem with fixed processing times, two new algorithms are developed for the problem under consideration. The proofs of optimality of both algorithms are presented. The execution of these algorithms is illustrated by two numerical examples. Finally, both algorithms are further modified to solve a more generalized problem where the time demanded to process a job is a general linear function of its beginning time.
کلیدواژه ها:
نویسندگان
Ching-Fang Liaw
Department of Industrial Engineering and Management, Chaoyang University of Technology, Taichung, Taiwan
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :