Risk Analysis and Management in Railway Project using Tunnel Design: A Literature Review
سال انتشار: 1398
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 392
فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_ARCE-1-4_001
تاریخ نمایه سازی: 2 دی 1398
چکیده مقاله:
Population growth makes public transportation needs increase, one of the needs for the availability of population growth is the need for availability of railway. However, the available land for railway construction is very limited, therefore experts design the railway using a tunnel. Risk analysis in Railway projects with tunnel design is carried out to determine the most important type of risks. The results of this research show that the railway project with tunnel design has the same risks as railway projects with other designs, there are site risk and environmental risk. After finding the most important risk, use the Multiphase risk management method to manage this risk.
کلیدواژه ها:
نویسندگان
kevin arga
Civil Engineering Department, Mercu Buana University, Jakarta, Indonesia
humoras purba
Industrial Engineering Department, Mercu Buana University, Jakarta, Indonesia
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :