An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem

سال انتشار: 1398
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 443

فایل این مقاله در 24 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JOIE-12-2_013

تاریخ نمایه سازی: 21 خرداد 1398

چکیده مقاله:

This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. Hence, in this paper, a mixed-integer formulation called the MMSRCPSP is proposed to minimize the completion time of project. Since the MMSRCPSP is strongly NP-hard, a new genetic algorithm is developed to find optimal or near-optimal solutions in a reasonable computation time. The proposed genetic algorithm (PGA) employs two new strategies to explore the solution space in order to find diverse and high-quality individuals. Furthermore, the PGA uses a hybrid multi-attribute decision making (MADM) approach consisting of the Shannon’s entropy method and the VIKOR method to select the candidate individuals for reproduction. The effectiveness of the PGA is evaluated by conducting numerical experiments on several test instances. The outputs of the proposed algorithm is compared to the results obtained by the classical genetic algorithm, harmony search algorithm, and Neurogenetic algorithm. The results show the superiority of the PGA over the other three methods. To test the efficiency of the PGA in finding optimal solutions, the make-span of small size benchmark problems are compared to the optimal solutions obtained by the GAMS software. The outputs show that the proposed genetic algorithm has obtained optimal solutions for 70% of test problems.

نویسندگان

Amir Hossein Hosseinian

Department of Industrial Engineering, Faculty of Engineering, Islamic Azad University, Tehran North Branch, Tehran, Iran

Vahid Baradaran

Department of Industrial Engineering, Faculty of Engineering, Islamic Azad University, Tehran North Branch, Tehran, Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Afruzi, E., Najafi, A.A., Roghanian, E., & Mazinani, M., (2014). ...
  • An Exact Algorithm for the Mode Identity Project Scheduling Problem [مقاله ژورنالی]
  • Agarwal, A., Colak, S., & Erenguc, S., (2011). A Neurogenetic ...
  • Agarwal, A., Colak, S., & Erenguc, S., (2015). Metaheuristic Methods, ...
  • Al-Anzi, F.S., Al-Zame, K., & Allahverdi, A., (2010). Weighted Multi-Skill ...
  • Almeida, B.F., Correia, I., & Saldanha-da-Gama, F., (2016). Priority-based heuristics ...
  • Azaron, A., Katagiri, H., Sakawa, M., Kato, K., & Memariani, ...
  • Bellenguez, O., & Néron, E., (2005). Lower Bounds for the ...
  • Bellenguez, O., & Néron, E., (2007). A branch-and-bound method for ...
  • Blazewicz, J., Lenstra, J.K. & Kan, A., (1983). Scheduling subject ...
  • Bouleimen, K., & Lecocq, H., (2003). A new efficient simulated ...
  • Chen, R., Liang, C., Gu, D., and Leung, J., (2017). ...
  • Cordeau, J., Laporte, G., Pasin, F., & Ropke, S., (2010). ...
  • Corominas, A., Ojeda, J., & Pastor, R., (2005). Multi-objective allocation ...
  • Correia, I., & Saldanha-da-Gama, F., (2014). The impact of fixed ...
  • Deb K., Pratap, A., Agrawal S., & Meyarivan, T., (2002). ...
  • Firat, M., & Hurkens, C.A.J., (2012). An improved MIP-based approach ...
  • Gao, J., Chen, R., & Deng, W., (2013). An efficient ...
  • Gomar, J., Haas, C., & Morton, D., (2002). Assignment and ...
  • Gutjahr, W.J., Katzensteiner, S., Reiter, P., Stummer, C., & Denk, ...
  • Gutjahr, W. J., Katzensteiner, S., Reiter, P., Stummer, C., & ...
  • Optimizing a Bi-objective Preemptive Multi-mode Resource-Constrained Project Scheduling Problem: NSGA-II and MOICA Algorithms [مقاله ژورنالی]
  • Hartmann, S., & Kolisch, R., (2000). Experimental evaluation of state-of-the-art ...
  • Hegazy, T., Shabeeb, K., Elbeltagi, E., & Cheema, T., (2000). ...
  • Hermerl, C., & Kolisch, R., (2010). Scheduling and staffing multiple ...
  • A Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities [مقاله ژورنالی]
  • Javanmard, S., Nadjafi, B., & Niaki, S.T.A., (2016). Preemptive multi-skilled ...
  • Kadrou, Y., & Najid, N.M., (2006). Tabu Search Algorithm for ...
  • Kazemipoor, H., Tavakkoli-Moghaddam, R., Shahnazari-Shahrezaei, P., & Azaron, A., (2013). ...
  • Kazemipoor, H., Tavvakoli-Moghaddam, E., & Sharezaei, P., (2013). Solving a ...
  • Li, H., & Womer, K., (2009). A Decomposition Approach for ...
  • Li, W., & Womer, K., (2009). Scheduling projects with multi-skilled ...
  • Lotfi, F.H., & Fallahnejad, R., (2010). Imprecise Shannon’s Entropy and ...
  • Maghsoudlou, H.M., Nadjafi, B., & Niaki, S.T.A., (2016). A multi-objective ...
  • Maghsoudlou, H.M., Nadjafi, B., & Niaki, S.T.A., 2017. Multi-skilled project ...
  • Mehmanchi, E., & Shadrokh, S., (2013). Solving a New Mixed ...
  • Three Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing [مقاله ژورنالی]
  • Miller, B., & Goldberg, D.E., (1996). Genetic algorithms, selection schemes, ...
  • Montoya, C., Bellenguez-Morineau, O., Pinson, E., & Rivera. D., (2014). ...
  • Myszkowski, P.B, & Skowronski, M., (2013). Specialized genetic operators for ...
  • Myszkowski, P.B., Skowronski, M., & Podlodowski, L., (2013). Novel heuristic ...
  • Myszkowski, P.B., Skowronski, M., Olech, L.P., & Oslizlo, K., (2015). ...
  • The Project Portfolio Selection and Scheduling Problem: Mathematical Model and Algorithms [مقاله ژورنالی]
  • Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems [مقاله ژورنالی]
  • Opricovic, S., & Tzeng, G. H., (2004). Compromise Solution by ...
  • Opricovic, S., & Tzeng, G. H., (2007). Extended VIKOR method ...
  • Ranjbar, M., Kianfar, F., & Shadrokh, S., (2008). Solving the ...
  • Tabrizi, B.H., Tavvakoli-Moghaddam, R., & Ghaderi, S.F., (2014). A two-phase ...
  • Valls, V., Perez, A., & Quintanilla, S., (2009). Skilled workforce ...
  • Walter, M., & Zimmermann, J., (2016). Minimizing average project team ...
  • Wu, M., & Sun, S., (2006). A project scheduling and ...
  • Yaghoubi, S., Noori, S., Azaron, A., & Tavakkoli-Moghaddam, R., (2011). ...
  • Yaghoubi, S., Noori, S., Azaron, A., & Fynes, B., (2015). ...
  • Zheng, H., Wang, L., & Zheng, X., (2015). Teaching–learning-based optimization ...
  • نمایش کامل مراجع