Estimation of filling rates of shallow mining pit lakes using finite element model
سال انتشار: 1388
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,594
فایل این مقاله در 6 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICWR01_195
تاریخ نمایه سازی: 15 آذر 1388
چکیده مقاله:
When mining is completed and dewatering operation is ceased, the piezometric surface is reestablished to its pre-mining equilibrium position. The formation of post-mining lake in mining excavation due the rebound process creates many environmental problems including surface and groundwater pollution. The main objective of this paper was to simulate groundwater recovery process in an open pit. It was found that the groundwater recovery process is very fast immediately after mine closure and cessation of dewatering operation as about 98 percent of initial head and can be recovered after 10000 days. The rate of recovery decreases as time progresses. Modelling of the rate at which a pit lake is formed would facilitate the development of a mine rehabilitation and environmental management plan during the design stage of surface mining operation.
کلیدواژه ها:
نویسندگان
A. Aryafar
Faculty of Mining, Petroleum and Geophysics, Shahrood University of Technology, Shahrood, Iran, P.O.Box: ۳۶۱۵۵-۳۱۶Faculty of
F. Doulati Ardejani
Faculty of Mining, Petroleum and Geophysics, Shahrood University of Technology, Shahrood, Iran, P.O.Box: ۳۶۱۵۵-۳۱۶Faculty of
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :