Flowshop Scheduling Problem with Bounded Setup and Processing Times to Minimize Maximum Lateness
سال انتشار: 1384
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,271
فایل این مقاله در 11 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICME07_230
تاریخ نمایه سازی: 6 آذر 1388
چکیده مقاله:
The two-machine flowshop scheduling problem to minimze maximum lateness is addressed, where setup times are treated as separate and sequencde-independent. Both processing and setup times on both machines are relaxed to be unknown variables. The only known information is that lower and upper bounds are known for both processing and setup times of each job. For such a scheduling environment, there may not exist a unique schedule that remain optimal for any realization of setup and processing times. Moreover, for such a scheduling environemnt, the realization of setup and processing times will not be known untill all the jobs are processed. Therefore, the objective for such a scheduling problem is to reduce the size of the solution set, which contains at least one optimal solution for any combinations of feasible realizations of processing and setup times. In this paper, a local and a global dominance relation are established in order to reduce the size of the solution set. Illustrative numerical examples are also given.
کلیدواژه ها:
نویسندگان
Ali Allahverdi
Department of Industrial and Management SystemsEngineering,College of Engineering and PetroleumKuwait University
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :