Transmission Expansion Planning Approach to Minimize Investment Cost Subject to Maximized Reliability Constraint

سال انتشار: 1396
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 519

فایل این مقاله در 7 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

COMCONF05_029

تاریخ نمایه سازی: 21 اردیبهشت 1397

چکیده مقاله:

In this paper, transmission expansion planning problem from transmission system operator (TSO) point of view is modeled and solved. The developed model, includes the reliability of power system which is one of the most important objectives of TSO.The reliability objective is considered under market-clearing process. Accordingly, bi-level programming model is used. The target of the transmission planning is to maximize system reliability while facilitating energy trading. The upper-level problem is constrained by a collection of lower-level problems representing market clearing with maximum social wale-fare objective. The developed model is mixed integer linear programming method which is solved by GAMS / Cplex

کلیدواژه ها:

Transmission expansion planning (TEP) ، bi-level programming ، market clearing ، social welfare ، reliability

نویسندگان

Shoorangiz Shams Shamsabad Farahani

Department of Electrical Engineering, Islamshahr branch, Islamic Azad University, Islamshahr, Iran

Morteza Rezaei nejad

South Kerman Electrical Distribution Co.