UTILIZING HOLLOW-CORES FOR CONSTRUCTION OF SLABS OF THE MEGA STRUCTURES TO SAVE COST AND TIME

سال انتشار: 1395
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 533

فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

NCCPM03_111

تاریخ نمایه سازی: 19 خرداد 1396

چکیده مقاله:

Construction of every structure consists of constructing the foundation, columns, walls and slabs. The most time consuming part in the analysing time of the projects is construction of the slabs. Fifty percent of time of the projects, especially mega structures like mega malls are allocated to construction of the slabs. Ways which can reduce this duration will reduce the cost of the projects as well. It is obvious if the client of the project can operate the project any sooner it will help him to save big amount of money. This condition is more highlighted in Middle Eastern countries like Iran because of the uncertainty and the inflation found in their market. This article focused on the role of precast concrete (hollow cores) to validate this theory that using this system of construction will help to reduce the cost and time of the projects. In this article we used the expert s opinion working in two different mega malls, one used this system and the other did not. The results show the efficiency of utilizing hollow-core system and its benefits. Expanding experience through these case studies, the method to estimate the influence of using hollow-cores in cost and time of the projects, the considerations should be observed to use the hollow-cores in its best shape is the main purpose of this article. The more the building area exists the more we can sense the effectiveness of this structural system.

کلیدواژه ها:

نویسندگان

s arabi

PhD Candidate faculty of architecture, University of Tehran, Tehran, Iran,

m.r darabpour

PhD Candidate department of Civil Engineering, Azad University, Central Branch

m Mohammadkhani

MSc, faculty of architecture, Shahid Beheshti university, Tehran Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Buettner, D.R.; Becker, R.J. 1998. Pci manual for the design ...
  • Caruana , C.; Grima, C.; Yousif, C.; Buhagiar S.; Curmi, ...
  • CMA (Concrete Manufactures Association). 2008. Hollow-core slab systems information manual. ...
  • Dai, J.; Goodrum, P. M; Maloney, W. F. 2009a. Construction ...
  • perceptions of the factors affecting their productivity. J. Constr. Eng. ...
  • Dai, J.; Goodrum, P. M; Maloney, W. F.; Srinivasan, C. ...
  • Dawood, N. N. 1996. A strategy of knowledge elicitation for ...
  • Ericson, Alvin C. 2010. Emulative Detailing in Precast Concrete Systems. ...
  • Fallon, E. 2000. _ Design of Hollow-core Slabs. Computing in ...
  • Grau, D.; Caldas, C. H.; Haas, C. T.; Goodrum, P. ...
  • Hersen, M.; Barlow, D. H. 1976. Single-case experimental designs: trategies ...
  • Ronald, H.D., Theobald, D. 2008. A system for rapid precast ...
  • Kimpland, S. L. 2009. 2009 comtractor productivity survey results. FMI ...
  • Kirikova, M. 2000. Explanatory capability of enterprise tmodels. Data and ...
  • Liberda, M.; Ruwanpura, J., Jergeas, G. 2003. Construction productivity improvement: ...
  • Miles, W. R.; Bergmann, D. J. 1993. Comparison of Cast-in-Place ...
  • NPCA (National Precast Concrete Association). 2012. NPCA quality control manual ...
  • PCI (Precast/Pre stressed Concrete Institute), 2000. Annual Financial and Cost ...
  • PCI (Pre c ast/prestressed cocrete institude). "Designing with precast and ...
  • Pheng, L. S., and Chuan, C. J. 2001. Just-in-time management ...
  • Rivas, R. A.; Borcherding, J. D.; Gonzalez, V.; and Alarcon, ...
  • Sacks, R.; Eastman, C. M.; Lee, G. 2004. Process Model ...
  • Shaw, Reece F. 2007. Sustainable pre c a st _ ...
  • Schramm, W. 1971. Notes _ studies of instructional media projects. ...
  • SCI (statistical centre of Iran). 2014. Building permits data Issued ...
  • TBY (The Business Year). 2013. The land is gold. The ...
  • Wang, C.; Liu, M.; Simon M.; Leming L. 2012. Causes ...
  • Warszawski _ Avraham M.; Carmel D. 1984. Utilization of precast ...
  • Yang, L. 1994. Design of prestressed hollow core slabs with ...
  • Yin, R.K. 2009. Case Study Research. 4th ed., SAGE Publications, ...
  • نمایش کامل مراجع