Solving Bi-Objective Fuzzy Project Capital Budgeting Problem as a Multi-Dimensional Knapsack by Fuzzy 0-1 Programming
محل انتشار: ششمین کنفرانس بین المللی مهندسی صنایع
سال انتشار: 1387
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 2,249
فایل این مقاله در 17 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC06_056
تاریخ نمایه سازی: 8 مهر 1387
چکیده مقاله:
selection of optimum portfolio of projects when an organization is involve with a set of project with a pre-determined net present value and initial investment cost, has both practical and theoretical importance which has made a great willing for researchers in last decades. in real world the net present value, profit, resource requirements and initial investment cost of an undone or even ongoing project usually can not be estimated deterministically in advance. In real cases, projectoutcomes including net present value and its profit mixed with ambiguity and vagueness. Moreover in most of situations the decision maker has no clear sense about the exact amoount of total budget of the organization for next decision horizon and required resources for a project has a notable ambiguity. fuzzy environment can present these situations properly. we develop a full fuzzy mathematical programming with fuzzy initial investment cost and fuzzy profit of a project as well as fuzzy right hand side as total available budget in a decision making horizon. We associated the problem to 0-1 fuzzy NP-hard problem. The aforementioned problem have solved through a fuzzy 0-1 programming for this fuzzy project capital budgeting. the proposed fuzzy has been tested an illustrative numerical examples. Due to our best Knowledge, this contribution is rarely considered in this field at the time of paper development.
کلیدواژه ها:
fuzzy programming ، Interval programming ، fuzzy Knapsack problem ، fuzzy Capital Budgeting Problem ، Fuzzy Numbers
نویسندگان
Kaveh Khalili Damghani
Department of system & Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran & Irankhodro Rail Industries Company (IRICO), Tehran, Iran
Mohammad Taghi Taghavifard
Department of system & Industrial Engineering, Tehran-South Branch, Islamic Azad University, Tehran, Iran
Mehdi Asadi
Irankhodro Rail Industries Company (IRICO), Tehran, Iran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :