Energy Delivery at Oil and Gas Wells Construction in Regions with Harsh Climate
محل انتشار: ماهنامه بین المللی مهندسی، دوره: 29، شماره: 2
سال انتشار: 1394
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 533
فایل این مقاله در 6 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJE-29-2_017
تاریخ نمایه سازی: 12 دی 1395
چکیده مقاله:
Energy delivery at well construction in regions with hard climate is distinguished by variable demand in electric and heat power. Energy consumption of drilling equipment, production and living facilities varies greatly during the year, depending on power load charts and climate conditions. Power supply of remote well construction sites is mostly accomplished by operating autonomous power sources, such as gas turbine units. In this regard efficiency enhancement of power units is seen as relevant task. Thus combined heat and power structure for efficient power supply of well construction operations is offered by the authors. Required amount of electric and heat energy at well drilling in harsh climate is calculated in the paper. Also scheme of energy delivering structure based on gas turbine units with flue gases heat utilization for rig objects heating is developed in the article.
کلیدواژه ها:
Combined Heat and PowerDrilling Operations ProvisionEnergy DeliveryGas Turbine
نویسندگان
V Morenov
National Mineral Resources University (Mining Universit), Electromechanical Department, Saint Petersburg, Russia
E Leusheva
National Mineral Resources University (Mining University), Oil and Gas Department, Saint Petersburg, Russia