THE REASONS OF COSTS DEVIATION IN THE IRAQI CONSTRUCTION PROJECTS - FIELD ASSESSMENT

سال انتشار: 1395
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 346

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_ARJ-2-5_001

تاریخ نمایه سازی: 2 دی 1395

چکیده مقاله:

The cost deviation is a big dilemma that accompanies with constructionproject. The study aims to identify the causes of cost deviation in Iraqiprojects environment. To achieve this goal, the researcher has beenconducting the following procedures, first: go through with open interviewswith experts to identify the reasons which have a negative impact on thecost of construction project, and secondly: perform a field study on eightconstruction projects. Five of these projects were completed on budget orunder budget, while the others completed over budget. By agreed of theexperts and the parties of the eight projects, the researcher found the mostimportant reasons leading to the cost deviation of the Iraqi constructionprojects, and we will mention some of them: Inability of company to meetproject requirements, Inadequate planning, Inaccurate estimation of the cost,Delayed cash flows by owners, Inefficient executive manager of project,Lack of control to the time of the project or predict the date of its end, Thenegative impact of the population in the project area, Multiple sources of thedecision and the overlap of powers, Poor performance of the contractor.And finally, the researcher offers a set of recommendations to overcomethese problems.

نویسندگان

H.K Al-Agele

Department of Civil Engineering, College of Engineering, University of Baghdad, Iraq

A.J Al-Hassan

Department of Civil Engineering, College of Engineering, University of Baghdad, Iraq