Scheduling NPD Projects based on a Boosted Particle Swarm Optimization
سال انتشار: 1395
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 721
فایل این مقاله در 7 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
CBCONF01_0613
تاریخ نمایه سازی: 16 شهریور 1395
چکیده مقاله:
For reducing the required development time and offering the new product faster, the efficient scheduling of the New Product Development (NPD) projects is important. Task overlapping is commonly regarded as the most promising strategy to reduce product development times. However, overlapping must be well planned by weighting the gain from the task overlapping against the additional time for rework. The objective of this research is to develop a resource constrained scheduling methodology for NPD projects considering overlapping of task couples. In this paper, a Boosted Particle Swarm Optimization (BPSO) is used to schedule NPD projects that includes overlapping process. In addition, two local search approaches have been developed to provide an optimal scheduling. The results of these approaches are better than the previous approaches.
کلیدواژه ها:
نویسندگان
Yasaman Mashhadi Hashem Marandi
Department of Computer Science, School of Mathematics, Statistics and Computer Science, College of ScienceUniversity of Tehran, Tehran, Iran
Hedieh Sajedi
Department of Computer Science, School of Mathematics, Statistics and Computer Science, College of ScienceUniversity of Tehran, Tehran, Iran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :