An integrated method for ranking of risk in BOT projects

سال انتشار: 1392
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 568

فایل این مقاله در 11 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

ICPEEE01_2112

تاریخ نمایه سازی: 16 شهریور 1395

چکیده مقاله:

In BOT approach, the private sector is granted a concession to plan, design, construct, operate and maintain a project in a certain period of time and after that it should be transferred to the government. In this paper, at first the risks of the BOT projects are identified, then we rank the risks based on their severity and effect on project objectives (time, cost, quality, safety and environmental) by two methods, namely FTOPSIS and FSAW. In the next stage obtained results by NGT method are integrated. After wise the occurrence and detection values of each risk are determined by experts and ultimately the risks are evaluated according to risk priority number (RPN) of failure mode and effect analysis (FMEA) technique. Finally, an example is shown to highlight the procedure of the proposed method at the end of this paper.

کلیدواژه ها:

نویسندگان

Mohsen Askari

Department of Industrial Engineering, Payame Noor University

Hamid Reza Shokrizadeh

Department of Management, Payame Noor University

Maryam Sedaghat

Department of Management, Allameh Tabataba'i University, Tehran ,Iran