Experiments on the arrangement and location of sacrificial piles to reduce erosion around spur dikes

سال انتشار: 1394
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 681

فایل این مقاله در 11 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

CIVILED01_033

تاریخ نمایه سازی: 20 دی 1394

چکیده مقاله:

In this paper, the efficacy of sacrificial piles to decrease scour size around spur dikes is investigated. The length and width of spur-dike top are 9.3 cm and 4.65 cm respectively and its sidewalls have inclination angles of 45 degrees. Sacrificial piles are installed at 90-degree angle to the sidewall of the channel at different upstream distances from the dikes’ nose and the effect of their location and number on scour reduction is studied. The results indicate that within the limit of present work, when 7 piles are used in the piles group at a distance of 2L upstream the dike’s nose, where L is the length of the dike perpendicular to the channel wall, the depth and volume of scour hole are reduced respectively up to30% and 60% compared with the case of single dike without any sacrificial piles.

نویسندگان

Shayan Barjastehmaleki

University of Trieste

Hooman Hajikandi

Islamic Azad University, Central Tehran Branch)

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Melville W.B., Lauchlan S. C. and Hadfield C. A. (1997), ...
  • Molinas A., Kheireldin K. and Wu B. (1998), :Shear stress ...
  • scour around spur dike like Localء 9.Rahman M., Murata H., ...
  • نمایش کامل مراجع