De-aeration of a diversion tunnel of a large-scale hydroelectric scheme
سال انتشار: 1383
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,881
فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
HDRS_02
تاریخ نمایه سازی: 16 آذر 1384
چکیده مقاله:
Due to the influence of a varying water level in the main reservoir, the Jokulsa Tunnel as diversion tunnel from a secondary intake is subjected to a transition from free-surface to pressurized flow. As to avoid damage in the main conduit as well as of the hydraulic equipment, the air entrained into and transported downstream by the pressurized flow has to be removed before the junction of the two tunnel branches. A novel concept of de-aeration, basically consisting of vertical drill holes distributed along the Jokulsa Tunnel, was developed and technical feasibility ascertained by means of two physical hydraulic models.A concise description of the concept itself as well as of the modeling procedures is given.
نویسندگان
Hansjürg Sigg
Laboratory of Hydraulics, Hydrology and Glaciology (VAW), Swiss Federal Institute of Technology (ETH), Switzerland
Urs Keller
Laboratory of Hydraulics, Hydrology and Glaciology (VAW), Swiss Federal Institute of Technology (ETH), Switzerland
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :