causes of handover delays in iranian oil pipeline projects
محل انتشار: هفتمین کنفرانس بین المللی مدیریت پروژه
سال انتشار: 1390
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 744
فایل این مقاله در 19 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IPMC07_093
تاریخ نمایه سازی: 14 شهریور 1393
چکیده مقاله:
during last few years, oil pipeline construction projects in iran have mostly experiened a delayed start of operation and final completion. There are a number of each of the project participants points of view i.e. the owner. Consultant and the contactor. this study reviews challenges in delivering lranian oil pipeline projects by focusing on the main key deliverable of the construction phase: i.e. operations acceptance and the issue of resolving commissioning and operation defects. literature review, case studies, and some interviews with involved managers ad experts were used in order to identify causes of delays.
کلیدواژه ها:
oil pipeline projects: delay :delay causes: iran
نویسندگان
narges jamal
senior project control enineer in IOPTC
M.M mortaheb
Member of educational board of sharif university (SUT)