Proactive and reactive strategies for project resource levelling

سال انتشار: 1390
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 786

فایل این مقاله در 11 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IPMC07_083

تاریخ نمایه سازی: 14 شهریور 1393

چکیده مقاله:

resource levelling problem considers resource usage pattern in project plan attempts to create a levelled baseline schedule. During execution however, some disruptions may occur activites may take longer or shorter than expected. These disruptions tpgether with reactive decisions bring us to a realized schedule which may not be levelled any more at the and of project. we propose different proactive and reactive strategies in planning and in execution and via an extensive simulation - based analysis evalute effectiveness the strategies. additonally, we show how traditional efforts to construct a levelled baseline might be fruitless in practice.

نویسندگان

M bagheri

islamic azad universigy, science and research branch faculty of engineering, deparment of industrial engineering, tehran,iran

F jolai

university of tehran,college of engineering, deparment of engineering, deparment of industrial engineering, tehran,iran

M.B aryanezhad

iran university of science and technology,deparment of industrial engineering, tehran,iran