Performance Prediction Models for Hard Rock Tunnel Boring Machines
محل انتشار: ششمین کنفرانس تونل ایران
سال انتشار: 1382
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 5,369
فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ITC06_59
تاریخ نمایه سازی: 24 آبان 1384
چکیده مقاله:
Tunnel Boring Machine (TBM) is one of the most popular tunneling equipment in the industry. Modern hard rock TBMs are very versatile and have been used very favorably in various ground conditions while setting advance rate records of over 170 m a day. There has been a lot of research on development of models to allow accurate prediction of machine rate of penetration in given ground conditions. These models, although successful in prediction of machine performance in many cases, are short of accounting for some of the parameters affecting machine performance in a variety of grounds. Moreover, with more accurate predictive capabilities and better understanding of operational parameters, accurate planning and cost estimation is possible, which allows for wider area application for TBMs. This justifies the initial high investments for the machine and facilitates increased productivity by proper planning of the back up system, matching machine specifications to the jobs site conditions, and reduces the risks involved in using a machine for a particular project.
Study and analysis of the rock cutting process by disc cutters is very important since discs are the most common cutting tools used on hard rock TBMs. The previous studies on this subject have been instrumental in developing models for estimation of rock cutting forces needed for design analysis and optimization as well as performance prediction of machines such as TBMs. This paper, offers a brief review of the previous research works in this field including an overview of rock indentation by disc cutter, failure mechanism, important parameters influencing on the performance. Also, models developed for performance prediction of hard rock TBMs based on the cutting forces will be introduced along with empirical models used for an overall estimation of the machine rate of penetration in a given ground condition. The paper will finally review the current efforts underway by the authors for improving the accuracy of the models
نویسندگان
Ahmad Ramezanzadeh
PhD student, URGC, INSA of Lyon, France
Jamal Rostami
Assi. professor, Dep. of Mining Eng. , Univ. of Tehran, Iran
Richard Kastner
Professor , URGC, Géotechnique, INSA of Lyon, France
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :