The Integration of Artificial Intelligence in Construction Project Management: A Comprehensive Review Across the Ten Knowledge Areas
سال انتشار: 1405
نوع سند: مقاله کنفرانسی
زبان: فارسی
مشاهده: 85
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICMT14_027
تاریخ نمایه سازی: 27 مهر 1405
چکیده مقاله:
The construction industry consistently underperforms in delivering projects on time, within budget, and at acceptable quality standards, partly due to the inadequacy of traditional static project management methodologies in complex and volatile environments. This study presents a systematic literature review examining the integration of Artificial Intelligence (AI) across the ten Project Management Knowledge Areas defined in the PMBOK Guide Sixth Edition. Peer-reviewed publications from ۲۰۲۰ to ۲۰۲۵ were retrieved from Scopus, Web of Science, and Google Scholar. Findings demonstrate that AI technologies including machine learning, deep neural networks, natural language processing, computer vision, reinforcement learning, and digital twins have delivered measurable improvements across all knowledge areas, from automated scope decomposition and predictive scheduling to dynamic cost modeling, real-time quality monitoring, proactive risk management, and intelligent procurement and stakeholder analysis. The integration of BIM with AI emerges as a foundational cross-cutting enabler. Critically, the reviewed evidence consistently positions AI as a decision-support instrument that augments rather than replaces professional judgment. This study provides a structured mapping of AI capabilities onto the PMBOK framework, offering both a consolidated reference for researchers and a practical guide for construction firms seeking evidence-based AI investment strategies.
کلیدواژه ها:
نویسندگان
Mahdi Besshagh
Master's student in Project and Construction Management, Faculty of Architecture and Urban Planning, Iran University of Art
Mohammad Hossein Mahmoudi Sari
Associate Professor, Department of Project and Construction Management, Faculty of Art and Architecture, Iran University of Art