Technical and Economic Evaluation of the Charavimaq Lead and Zinc Mine to Determine the Ultimate Pit Limit

سال انتشار: 1405
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 32

فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_SDMEJ-9-1_006

تاریخ نمایه سازی: 22 مهر 1405

چکیده مقاله:

Technical and economic evaluation alongside the determination of the ultimate pit limit is fundamental in open-pit mine planning to maximize profitability while adhering to operational constraints. This research conducts a comprehensive technical and economic assessment of the Charavimaq lead and zinc mine in Iran to identify the optimal extraction boundary and production schedule. A three-dimensional geological block model of the deposit was constructed using Datamine software based on exploratory drill hole data, lithology, and element grades. Subsequently, GEOVIA Whittle software, utilizing the Lerchs-Grossmann optimization algorithm, was employed to generate nested pits and determine the economically optimal ultimate pit limit. The strategic evaluation revealed that the selected optimal pit, characterized by a specific stripping ratio and operational lifespan, yields a highly positive Net Present Value and a robust Internal Rate of Return, confirming the project's financial viability. Furthermore, a comprehensive sensitivity analysis demonstrated that the project's economic sustainability is most vulnerable to fluctuations in the global price of zinc and mining operational costs. The integration of advanced block modeling with dynamic economic optimization provides a reliable framework for risk mitigation and strategic decision-making in similar small-scale, polymetallic open-pit mining operations.Technical and economic evaluation alongside the determination of the ultimate pit limit is fundamental in open-pit mine planning to maximize profitability while adhering to operational constraints. This research conducts a comprehensive technical and economic assessment of the Charavimaq lead and zinc mine in Iran to identify the optimal extraction boundary and production schedule. A three-dimensional geological block model of the deposit was constructed using Datamine software based on exploratory drill hole data, lithology, and element grades. Subsequently, GEOVIA Whittle software, utilizing the Lerchs-Grossmann optimization algorithm, was employed to generate nested pits and determine the economically optimal ultimate pit limit. The strategic evaluation revealed that the selected optimal pit, characterized by a specific stripping ratio and operational lifespan, yields a highly positive Net Present Value and a robust Internal Rate of Return, confirming the project's financial viability. Furthermore, a comprehensive sensitivity analysis demonstrated that the project's economic sustainability is most vulnerable to fluctuations in the global price of zinc and mining operational costs. The integration of advanced block modeling with dynamic economic optimization provides a reliable framework for risk mitigation and strategic decision-making in similar small-scale, polymetallic open-pit mining operations.

نویسندگان

Dr. Hojjat Mahbobipour

Department of Mining, V.C., Islamic Azad University, Varzeghan, Iran

Farahnaz Asadzade

Department of Mining, V.C., Islamic Azad University, Varzeghan, Iran.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Asadzade, F., & Mahbobipour, H. (2026). Technical and economic evaluation ...
  • Ataei, M. (2023). Advanced open pit mine design. Shahrood University ...
  • Ataei, M., & Hosseini, S. (2011). The necessity of economic ...
  • Azadi, M., et al. (2021). Optimization of cut-off grade in ...
  • Dehghani, H., & Ataee-Pour, M. (2012). Determination of the effect ...
  • Fazlavi, A. (2012). Technical and economic investigation of mining projects. ...
  • Hustrulid, W., & Kuchta, M. (2006). Open pit mine planning ...
  • Kolahdoozan, M., & Viseh, S. (2007). Market risk analysis in ...
  • Lane, K. F. (1988). The economic definition of ore: Cut-off ...
  • Mirzaei, M., et al. (2023). Production planning in Whittle software ...
  • Oraei, K., & Khodaverdi, A. (2002). Mineral resources economics. Ferdowsi ...
  • Osanloo, M. (2005). Surface mining methods (Vol. 1). Amirkabir University ...
  • SAMENI KEIVANI, F. A. R. I. B. A., Amirnejad, S., ...
  • Sameni Keivani, F., & Khalili Sourkouhi, Z. (2014). A survey ...
  • Ramazan, S., & Dimitrakopoulos, R. (2018). Optimization of mining projects. ...
  • Sayadi, A. R., Monjezi, M., Heydari, M., & Vahidi, M. ...
  • Society for Mining, Metallurgy, and Exploration (SME). (2011). SME mining ...
  • Whittle, J. (1988). Beyond optimization in open pit design. In ...
  • نمایش کامل مراجع