Integrating Weighted Delay Index (WDI) with Dynamic Critical Path Analysis for Enhanced Delay Assessment in Construction Projects
محل انتشار: مجله پژوهشگران مهندسی عمران، دوره: 8، شماره: 1
سال انتشار: 1405
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 31
فایل این مقاله در 14 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JCER-8-1_005
تاریخ نمایه سازی: 1 تیر 1405
چکیده مقاله:
Project delay remains one of the most persistent challenges in construction management, often leading to significant cost overruns, contractual disputes, and stakeholder dissatisfaction. Traditional scheduling and delay analysis methods—such as Critical Path Method (CPM), Earned Value Management (EVM), and conventional Extension of Time (EOT) techniques—tend to overlook the relative importance of activities and the dynamic nature of project execution. This study introduces the Weighted Delay Index (WDI), a novel metric that integrates activity-specific weights with dynamic critical path analysis to provide a more nuanced evaluation of delay severity. Activity weights are derived through the Analytical Hierarchy Process (AHP), incorporating four key dimensions: time, cost, risk, and technical impact. The methodology is validated through multiple case studies of construction projects, where WDI trends are compared against actual project delays determined via Time Impact Analysis. Results indicate that Project Duration is the dominant predictor of overall delays, while WDI offers significant diagnostic and managerial value by identifying critical activities whose delays disproportionately affect project performance. Workforce Intensity is found to moderate delay outcomes, with higher intensity generally reducing delay severity. The proposed framework provides project managers with an early-warning and prioritization tool, enabling targeted intervention strategies that go beyond aggregated delay measures. The study contributes to both theory and practice by bridging the gap between deterministic scheduling and dynamic, activity-sensitive delay analysis.Project delay remains one of the most persistent challenges in construction management, often leading to significant cost overruns, contractual disputes, and stakeholder dissatisfaction. Traditional scheduling and delay analysis methods—such as Critical Path Method (CPM), Earned Value Management (EVM), and conventional Extension of Time (EOT) techniques—tend to overlook the relative importance of activities and the dynamic nature of project execution. This study introduces the Weighted Delay Index (WDI), a novel metric that integrates activity-specific weights with dynamic critical path analysis to provide a more nuanced evaluation of delay severity. Activity weights are derived through the Analytical Hierarchy Process (AHP), incorporating four key dimensions: time, cost, risk, and technical impact. The methodology is validated through multiple case studies of construction projects, where WDI trends are compared against actual project delays determined via Time Impact Analysis. Results indicate that Project Duration is the dominant predictor of overall delays, while WDI offers significant diagnostic and managerial value by identifying critical activities whose delays disproportionately affect project performance. Workforce Intensity is found to moderate delay outcomes, with higher intensity generally reducing delay severity. The proposed framework provides project managers with an early-warning and prioritization tool, enabling targeted intervention strategies that go beyond aggregated delay measures. The study contributes to both theory and practice by bridging the gap between deterministic scheduling and dynamic, activity-sensitive delay analysis.
کلیدواژه ها:
Construction project delays ، Weighted Delay Index (WDI) ، Dynamic Critical Path Method ، Extension of Time (EOT) methods ، Delays
نویسندگان
Amin Moradi
Amirkabir University of Technology image/svg+xml
Mohsen Asgharinia
Amirkabir University of Technology image/svg+xml
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :