Evaluation of project knowledge management risks using DEMATEL-ISM integrated technique (Case study: Golgohar Mining and Industrial Company)

سال انتشار: 1404
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 30

فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

SECONGRESS03_087

تاریخ نمایه سازی: 20 بهمن 1404

چکیده مقاله:

In today's project environments, various risks can directly or indirectly impact project success. Therefore, identifying and understanding the relationships between these risks helps managers adopt a more comprehensive perspective and make better decisions to mitigate potential negative effects. The DEMATEL-ISM method, as an effective tool, enables in-depth and structured analysis of the relationships between risks. In this study, influential and influenced risks are identified and prioritized based on expert opinions. This analysis can help project managers focus their resources and efforts more effectively on controlling key risks. Additionally, this approach allows project owners to take timely actions by better understanding the chains of influence, thereby preventing cost increases and the loss of knowledge. Thus, risk management plays a crucial role in the success of projects, and the proposed approach in this study can lead to better decision-making in this regard.

نویسندگان

Zahra Nezhad Heydari

Master's student in Industrial Engineering, Project Management, Zand University, Shiraz, Iran

Mohammad Kazem Etemad

Assistant Professor of Industrial Engineering, Zand Institute of Higher Education, Shiraz, Iran

Mehdi Abtahi

Assistant Professor, Department of Management, Islamic Azad University, Marvdasht, Iran