Risk Analysis and Reducing Measures in the Tunneling Project of Tabriz Metro Line ۲
سال انتشار: 1404
نوع سند: مقاله ژورنالی
زبان: فارسی
مشاهده: 53
فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_ANM-15-43_002
تاریخ نمایه سازی: 30 تیر 1404
چکیده مقاله:
Risk management and control are essential tools in various engineering fields, particularly in tunneling projects, which are inherently associated with a high degree of uncertainty and risk. Due to these uncertainties, risk management plays a crucial role in such projects. Given the complexity of tunneling, especially in urban environments, it is vital to identify, evaluate, and analyze risks throughout the project lifecycle. This study examines the geotechnical conditions of Tabriz Metro Line ۲, taking into account factors such as the tunnel boring machine (TBM), support structures, and human resources. The risks along the project route have been identified, prioritized, and mitigation strategies have been proposed to reduce these risks. The risks in the Tabriz Metro Line ۲ project were categorized into six main groups: geotechnical hazards, excavation machinery, construction period, support and human resources, design and research phase, and management. Each category’s hazards were identified, evaluated, and key influencing factors were analyzed. Based on the risk analysis results, the risks were classified into high, medium, and low categories, and appropriate mitigation measures were suggested for each level of risk. Through the implementation of effective risk response techniques, high-risk hazards were reduced by ۳۹%, and medium-risk hazards were reduced by ۲۳%. This research provides valuable insights that can improve the overall quality and efficiency of the Tabriz Metro Line ۲ tunneling project.
کلیدواژه ها:
Mechanized excavation ، risk analysis ، Probability ، Risk management program (RMP) ، Geotechnical risks
نویسندگان
Mohammad Darbor
Dept. of Mining Engineering, Sahand University of Technology, Tabriz, Iran
Hamid Chakeri
Dept. of Mining Engineering, Sahand University of Technology, Tabriz, Iran
Mehdi Tabarmaye
Dept. of Mining Engineering, Sahand University of Technology, Tabriz, Iran
Hamed Baghali
Dept. of Mining Engineering, Sahand University of Technology, Tabriz, Iran
Alireza Talebinejad
Tabriz Metro Line ۲, Tabriz, Iran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :