Integrated Project Delivery Implementation Challenges in the Construction Industry

سال انتشار: 1398
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 217

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_CEJ-5-8_002

تاریخ نمایه سازی: 28 تیر 1404

چکیده مقاله:

Huge financial resources are spent in the construction industry all over the world, which are frequently wasted largely due to a lack of proper planning. In recent decades, in an attempt to overcome challenges, various contractual and administrative systems have been used by construction owners/clients. One such system has been Integrated Project Delivery (IPD). Its implementation has, however, experienced drawbacks. Identifying such drawbacks is an initial step in attempting to resolve them, and this paper aims to identify and prioritize the IPD implementation drawbacks in the context of the Iranian construction industry. A comprehensive list of IPD implementation drawbacks is prepared using a questionnaire survey. An in-depth literature review of the IPD concept has been combined with a review of various case studies applying the IPD system. The results were analyzed using the Robust Exploratory Factor Analysis (EFA) method. ۲۲ drawbacks in the Construction Industry were categorized under four themes; contractual, environmental, managerial, and technical. Results show that contractual drawbacks are the most significant. The implication of this research is that identifying and classifying IPD implementation drawbacks provides a useful reference to managers and owners of the construction industry, for identifying and codifying solutions to overcome them.Huge financial resources are spent in the construction industry all over the world, which are frequently wasted largely due to a lack of proper planning. In recent decades, in an attempt to overcome challenges, various contractual and administrative systems have been used by construction owners/clients. One such system has been Integrated Project Delivery (IPD). Its implementation has, however, experienced drawbacks. Identifying such drawbacks is an initial step in attempting to resolve them, and this paper aims to identify and prioritize the IPD implementation drawbacks in the context of the Iranian construction industry. A comprehensive list of IPD implementation drawbacks is prepared using a questionnaire survey. An in-depth literature review of the IPD concept has been combined with a review of various case studies applying the IPD system. The results were analyzed using the Robust Exploratory Factor Analysis (EFA) method. ۲۲ drawbacks in the Construction Industry were categorized under four themes; contractual, environmental, managerial, and technical. Results show that contractual drawbacks are the most significant. The implication of this research is that identifying and classifying IPD implementation drawbacks provides a useful reference to managers and owners of the construction industry, for identifying and codifying solutions to overcome them.

کلیدواژه ها:

Integrated Project Delivery (IPD) Challenges Project Key Stakeholders Construction Robust Exploratory Factor Analysis (EFA).

نویسندگان

Zahra Kahvandi

M.Sc., Department of Project and Construction Management, MehrAlborz University (MAU), Tehran,, Iran, Islamic Republic of

Ehsan Saghatforoush

Senior Lecturer, School of Construction Economics and Management, University of the Witwatersrand, Johannesburg,, South Africa

Ahad ZareRavasan

Post-Doctoral Researcher, Department of Corporate Economy, Faculty of Economics and Administration, Masaryk University, Brno,, Czechia

Christopher Preece

Professor, Centre on Sustainable Built Environment, Abu Dhabi University, Abu Dhabi,, United Arab Emirates